Showing the 12-photo build sequence.
Site Setup & Kit Delivery
The installation area and delivered kit materials before structural assembly began.
Prefabricated Components
Factory-prepared timber components organized on site for assembly.
Floor & Wall Framing
Floor platforms and wall-frame sections prepared across the three cabin sites.
First A-Frame Raised
The first main A-frame section was lifted into position with site equipment.
Frame Installation
A closer view of the prefabricated frame sections being positioned and secured.
Framing Complete
The three primary A-frame structures standing together before roof enclosure.
Roof Insulation & Battens
Insulation, sheathing zones and timber battens visible before the final roof covering.
Roof Membrane & Insulation
Crew working across the roof membrane while adjacent cabins show other layer stages.
Standing-Seam Roofing Begins
Dark standing-seam metal panels installed progressively across the steep A-frame roof.
Standing-Seam Roof Completion
Final standing-seam panels and ridge work completed on the front cabin.
Front Glazing
Insulated front glazing and glazed doors installed as the cabin shells were enclosed.
Core & Shell Complete
All three structural core-and-shell packages assembled before local finishing work.